Do you know the Precautionary Measures for the Topless Tower Crane Disassembly and Climbing Frame Accident?
As a Heavy Machinery Tower Crane Manufacturers , we believe that the following four measures should be taken to prevent such accidents: (1) Formulation of climbing frame disassembly and lifting scheme Before disassembling the climbing frame, a detailed plan for disassembling and lifting the climbing frame should be formulated. The plan should indicate the number of sections for the disassembly of the climbing frame, the mass of each frame, the width of the tower crane when lifting each section of the climbing frame, and the rated lifting mass of the tower crane at that range. Topless Tower Crane After all the climbing frame fixing bolts are removed, the climbing frame will sink instantly and all the mass of the climbing frame will be loaded on the tower crane. At this time, the impact load on the Topless Tower Crane is much greater than the mass of the object being hoisted. Therefore, when formulating a climbing frame disassembly and lifting scheme, a certai...